Public Notices

For all Citizen Advisory Board legal notices, Floodplain Permit notices, and City Council legal notices, the public notices will be published here.

FLOODPLAIN PERMITS:

PUBLIC NOTICE

APPLICATION has been made by James Lauersdorf for a FLOODPLAIN PERMIT from the City of Three Forks to build a 10’ by 20’ shed at the property located at Lots 5 and 6 of Block 9 of the Three Forks Original Townsite, commonly referred to as 24 4th Avenue E.  Plans and specifications for this project can be viewed at the Three Forks City Office at 206 Main Street, Three Forks, MT or linked below.

Public comments will be taken in support of and in opposition to this request for 15 calendar days from April 5th, 2025, the 1st date of this posting.  Written testimony is preferred. If there are any questions concerning this request, please contact Ms. Kelly Smith, City Zoning Official(email ksmith@threeforksmontana.us,  phone 406-285-3431).

Lauersdorf Flood Application

ZONING ISSUES:

There are several Zoning Chapters being amended and some new ones on the way as well.  The Zoning & Planning board has been meeting additional dates outside of their regularly scheduled 3rd Thursday of the month.  Their next meeting is 4/22/2025 at 6:30PM at City Hall, 206 S. Main Street, Three Forks.  These chapters may be reviewed at https://threeforks.municipalimpact.com/zoning-and-planning.  For questions contact Kelly Smith, City Zoning Official (phone 285-3431).

NOTICE is hereby given of a PUBLIC HEARING to be held before the Three Forks Zoning and Planning Board on Tuesday, April 22, 2025, at 6:30 P.M. in the City Hall Council Chambers, 206 S. Main Street, Three Forks, Montana.

Ryan Malmquist has made an application for a Conditional Use Permit for the property located at 67 N 7th Avenue East, COS 789A.  Said request is for approval to construct a greenhouse / plant nursery as a home business within Public Lands zoning.

The CITY COUNCIL will conduct a PUBLIC HEARING on Tuesday, May 13, 2025, at 6:00 P.M., and act on the recommendation of the Zoning & Planning Board.

At each PUBLIC HEARING, TESTIMONY will be taken in support of and in opposition to this request.  Written testimony is also acceptable and may be sent to PO Box 187, Three Forks, MT 59752 or ksmith@threeforksmontana.us.

The complete application and proposed site plan for this request may be reviewed at the City Office or on the City’s website at www.threeforksmontana.us.  For questions concerning this request, contact Kelly Smith, City Zoning Official (phone 285-3431).  (Attendance via Zoom will be offered.  Contact City Hall for Meeting ID.)

 

CITY COUNCIL PUBLIC HEARINGS:

Nothing scheduled at this time.

 

UPCOMING WATER MAIN REPLACEMENT PROJECT:

Noticed the blue spray paint around the water mains on the east side of town? Well, that's for our upcoming water main replacement project.
The water distribution line improvements will occur on:
--2nd and 3rd Avenues E between E Elm and E Neal,
--4th Avenue E between E Elm and E Cedar, and
--E Elm, E Cedar, and E Ash Streets between 2nd and 4th Avenues E, and E Neal Street between E 2nd and 3rd Avenues E.
The project will replace all of the old cast iron mains with new PVC water mains on the avenues and will install new PVC water mains on the streets. The replacement of the lines will both help prevent water line leaks and also prevent the system’s fire flow capabilities. The project will also replace the service lines between the new main and curbstop (customer valve) for each customer along the way. The contractor is Emerine Contracting based out of Anaconda, MT. They are experienced with this type of work and are looking forward to a successful project.
Their schedule is to begin mobilizing equipment to Three Forks as soon as possible. This will include various large pieces of equipment including excavators and loaders. They will being work on April 14, 2025. There will be road closures related to the work, and the contractor will provide notices and signage to indicate where and when these closures will occur. If there are any interruptions to water service, the contractor is required to provide a minimum of 48 hour notice to all customers. It is their intent to have very few service interruptions.
The project will continue throughout the summer. As portions of the project are completed, the contractor will clean the area and prepare to pave the portion of the street which was disturbed. They will also replace any curb, gutter, and sidewalk that is disturbed as part of construction. The anticipated end date for the project is in September, with final cleanup continuing into October.

Contact Info

Crystal Turner
City Clerk
4062853431
cturner@threeforksmontana.us

Kelly Smith
City Treasurer, Zoning Official
4062853431
ksmith@threeforksmontana.us